This Is Voc Port To Install Additional 5Mw Solar Institute At Tuticorin Inward India
As per the latest press liberate of V.O.Chidambaranar Port Trust at Tuticorin, it has signed a bargain amongst Solar Energy Corporation of Bharat (SECI) for installation of five MW similar a shot grid connect type solar ability plant.
Solar Energy Corporation of India (SECI), a fundamental world sector enterprises nether MNRE, has been implementing diverse schemes to educate solar sector inward the country.
The solar projection volition last built nether Power Purchase Mode at an estimated toll of Rs. thirty crore past times the SECI in addition to target completion past times March, 2017, reports ET.
The expected annual ability generation from the 5MW solar ability constitute volition last 7.5 1000000 units per year.
Reduction of carbon emission past times this projection volition last 8,025 metric tonnes per year, says press release.
Image credit: The Hindu
As a business office of Green Port initiative, V.O.Chidambaranar Port Trust , has already commissioned a 100 KW solar ability constitute at the roof meridian of the Administrative Building of V.O.Chidambaranar Port Trust on 14.08.2015.
The annual ability generation of solar ability from this 100KW solar ability constitute is 1.70 lakhs units.
Another 400KW Solar ability constitute is nether installation on the roof meridian of diverse buildings of V.O.Chidambaranar Port Trust in addition to expected to last commissioned during the calendar month of Oct 2016.
Expected ability generation from 400KW solar ability constitute is 6,80,000 units per year.
The full reduction of carbon emission for 500KW solar ability constitute volition last 910 metric tonnes per year. (Source: VOC Port)